New refrigeration unit in workshop N-13-14
The main function of the new unit is additional cooling of the coolant from the AKHU-1 to the specified temperatures based on the installation regulations for the needs of the consumer workshops. It became necessary to increase the capacity and reset the load from the existing installation (AKHU-1) and increase productivity. At present time the installation is operating normally under the round-the-clock control of shift personnel. |
|